边做打电话边被躁bd视频_羞羞漫画喷水漫画yy漫画_天堂久久一区_福利一二三区_性xxxx视频播放免费,午夜影院污,av网站久久,国产又黄又爽又色的免费视频白丝

CN

About Us

< About Us
Development History
July 30

Three Gorges Power Plant realized monthly generating output of over 10 kWh for the first time, generating 10.3 kWh in July, equivalent to the 2.5 months of power consumption of Beijing.

16:30 on October 30

The last hydropower generator set (No. 15 unit) on the left and right banks of Three Gorges Project was put into production and operation, marking that all 26 units on the left and right banks of the Three Gorges have been put into production one year in advance, with the total installed capacity reaching the design 18,200 MW and with the power generating output ranking top in the global hydropower industry.